This conveyor job came out of necessity of our Client needing to get back into operation quickly after their primary conveyor failed. Capra managed the removal of the old conveyor and the engineering of the new conveyor. Local fabrication shops were full, so Capra performed the fabrication and installation of the new conveyor and head house allowing our Client to quickly resume production.